Re-Modeling of Hydel Station Gupis siliharang E&M Work

Hydropower Engineering
Solo Contractor
Project Overview

TOTAL PROJECT COST

Rs. 10.70 Million

TIMELINE / DURATION

3.0 Years (Sep-2007 to Dec-2010)

EMPLOYER / CLIENT

Water & Power Division Ghizar

Water & Power Department GB PWD Ghizar

CONTRACTOR ROLE

Independent Contractor (Solo)

Technical Execution Scope & Summary

The Re-Modeling of the Hydel Station at Gupis Siliharang, specifically focusing on Electromechanical (E&M) Work, was a significant initiative that commenced in September 2007 and successfully concluded in December 2010, spanning a duration of 3 years. The total cost incurred for...

Note: Detailed execution blueprints, drawings, and monthly reports are archived in the main corporate database.

Official Documentation & Certificates

Gupis Station Re-Modeling Attachment

Recommended Projects

Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 2. Four (4) Nos. of Bridges.)
Solo
Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 2. Four (4) Nos. of Bridges.)
Budget & Timeline

52.77 Million / 1.5 Years

Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 4 Six (6) Nos. of Bridges.)
Solo
Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 4 Six (6) Nos. of Bridges.)
Budget & Timeline

51.89 Million / 1.5 Years

Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 5. Five (5) Nos. of Bridges.)
Solo
Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-01 Lot 5. Five (5) Nos. of Bridges.)
Budget & Timeline

52.77 Million / 1.5 Years

Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-02 Lot 4. One (1) Nos. of Bridge.)
Solo
Construction of Abutments including assembling and launching of steel bridges (NCB-AJK-EBP-02 Lot 4. One (1) Nos. of Bridge.)
Budget & Timeline

10.63 Million / 1.5 Years